Start with your kitchen plan and the existing room
Send the kitchen supplier’s layout, product list, room photos and postcode. Cabinet dimensions, worktop runs, appliance positions and the condition of floors and walls affect how the kitchen will fit. Jamie checks measurements and access before confirming the installation rather than pricing a complete kitchen from one photograph.
Cabinets, worktops and the finishing details
The agreed installation can include base and wall units, tall cabinets, doors, drawers, fillers, end panels, plinths and handles. Suitable laminate worktops, joints and cut-outs can be planned alongside the units. Specialist stone or quartz worktops need the appropriate fabricator; the quote makes those arrangements clear.
- Base units, wall cabinets and tall housings
- Cabinet alignment, doors, drawers and hardware
- Agreed worktop installation and finishing trims
- Suitable splashback, tiling and making-good work by agreement
Preparation and connected services are part of the discussion
Removal of the old kitchen, repairs to supporting surfaces, waste disposal and decoration are not assumed to be included: each is agreed in the scope. Gas appliances are handled by a suitably qualified Gas Safe registered engineer. Where electrical changes or other specialist services are required, Jamie brings in the appropriate trades and agrees responsibility before work begins.
Practical kitchen replacements for rental properties
Landlords and letting agents can discuss replacing a worn kitchen between tenancies or planning a more substantial upgrade. Durable finishes, product availability, tenant access and the desired completion date can be considered together. Tell Jamie whether the property is vacant or occupied and which parts of the existing kitchen you intend to keep.
A defined project price, not a running hourly bill
The fixed quotation sets out the included installation work, materials or customer-supplied products, specialist elements and exclusions. Timing and any payment stages are agreed before acceptance. If hidden damage or a requested change affects the scope, Jamie explains the options and obtains agreement before extra chargeable work proceeds.